Relocation of the road III/42510 in Rajhrad - Study
Kubík, Peter ; Pěknica, Martin (referee) ; Radimský, Michal (advisor)
The aim of the diploma thesis is to design realignment of road III/42510 Stara Posta in Rajhrad, where there will be an intersection with the planned construction of a high-speed railway. The road serves as a bypass of the Rajhrad for trucks, and therefore it is required to maintain traffic even during the construction of the VRT. The study is to find the optimal option and further develop it into drawings of situations, profiles and sample cross-sections.
HST Station at the Airport Brno Tuřany
Viktora, Jakub ; Hladík, Antonín (referee) ; Nový, Alois (advisor)
High-speed corridor is the future of travellibg. Many Eauropian states have begun with building it a few years ago and it works well. The Czech Republic still does not have this form of transport, but due to the location it will be necessary to build high quality railways even here for the future connection across Europe. This thesis deals with the construction of high-speed train stop (the HST) nearby the airport Brno Turany. The service follows the previous semestral work - Brno main railway station. The HST station building is drafted as a bridge over the rail and the platforms, it works not only as a check-in and waiting area but also like a pedestrian crossing over the corridor. The solid responds to the airport nearby and used bridge construction to smartly takes roof up. Public parts are at ground level, technical background and maintenance are located along the platforms below the ground level.
Design of the Southern Connection from the High-Speed Line to Svetla nad Sazavou Station
Dvořák, Matěj ; Janoušek, Jan (referee) ; Říha, Tomáš (advisor)
This master thesis contains the design of the alternative northern connection of high-speed track Prague – Brno – Breclav to station Svetla nad Sazavou, including optimization of the main track between kilometres 95.3 and 102.3. This connection will be used as the temporary end of the high-speed track. Design speeds of the connection are 160 kph and 200 kph, switches are in kilometres 95.9 and 98.5.
Domestic heat pumps
Merta, Libor ; Lisý, Martin (referee) ; Pospíšil, Jiří (advisor)
The Bachelor´s Thesis deals with domestic heat pumps. It is devided into two basic parts. In the first part, an operating principle, components and various types are described. Particular kinds of low-energy sources including characteristical features and comparision are mentioned there as well. In the second part, a project for a domestic heat pump is prepared. The project includes proposition of a particular heat pump, a borehole and an amount of heat needed for heating and a preparation of warm water. At the end, a complete economical balance including an economic return of the investment is mentioned.
Implementation of Subtructure of family house in Třebíč - Nové Město
Bobek, Vojtěch ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
This bachelor thesis focuses on a technological phase of laying foundations of a detached house using drilled micropiles. The foundation features in the given location are complicated because of thick layer of construction debris. The condition of sufficient load-bearing capacity of subsoil is fulfilled first by the deeper maternal rock. The main aims of the thesis are to prepare technological procedure for earthworks and for application of micropiles, to solve construction logistics, to plan financial and time aspects, to propose machinery, to inspect quality of building process and finally to guarantee safety while working.
HST Station at the Airport Brno Tuřany
Kuchtík, Pavel ; Ruller, Ivan (referee) ; Nový, Alois (advisor)
This diploma thesis was prepared as an architectural study. The subject of the proposal was design of VRT station in Brno-Tuřany, near Brno airport. It was designed station building with platforms and four tracks. Two of them are passable and the other two are stationary. Rails leads below ground level. Above the rails is rail station that connect both areas next the rail corridor. Railway station serves primarily to transfer between rail and air transport.
HSL (RS42) Design of the Track Section Nova Ves Junction - Louny for mixed traffic
Losenický, Miloš ; Janoušek, Jan (referee) ; Dušek, Erik (advisor)
The aim of the master’s thesis is to design a new high-speed line between junction Nova ves and railway station Louny and conventional line between junction Úžice and junction Nová Ves. HSL is designed for mixed transport. Track speed of HSL is 250 kph. Conventional line is designed for track speed 160 kph and track is designed in concurrence with RS4. Speed of freight trains is 100 kph.
Provision of alternative water sources for a real estate surrounded by foreign property
Kukol, Jan ; Šmahel, Milan (referee) ; Dvořák, Josef (advisor)
The first part of this thesis is focused on water wells and their classification. A big part of this thesis is an essay on groundwater. This thesis also examines the various technical parts of drilled wells and dug wells. The design of pump is discussed briefly. The second part of this thesis is focused on objective and financial complexity of proposed solutions.
HSR (RS42) Design of the Track Section Nova Ves Junction - Louny
Losenický, Miloš ; Janoušek, Jan (referee) ; Dušek, Erik (advisor)
The aim of bachelor thesis is to design a new high-speed line between Nova ves – railway station Louny. Route of HSR is designed only for passenger traffic and for track speed 250 kph. The track section starts by the road II/118. The thesis includes the design of the track junction in front of the railway station Louny with the modification of the existing railway lines and including the design of the exit from the HSR.
Depth drilling in geology
Kudrna, Tomáš ; Jaroš, Aleš (referee) ; Kalivoda, Milan (advisor)
This bachelor thesis is focused on research of technologies and equipment of depth drilling in geology. This thesis contains description of methods used for borehole drilling. Furthermore, the description of common drill rigs is included. The thesis also deals with drilling tools and their working modes. Another part of the thesis is focused on the overall view of the borehole drilling process and its connection with ecology.